Lauren completed fabrication of all 2” and larger piping (including underground) and (24) modular equipment skids for Lauren's 225MW fast track EPC Cogeneration II Project in Las Vegas, Nevada. This included fabrication and pre-assembly of a 600’ main pipe rack in 60’ lengths – complete with piping (in position) with supports, guides, painting and insulation. Not including the underground and rack piping, Lauren fabricated 1,330 spools with 8,100 welds within 5 months. Lauren also fabricated all required electrical panels. |