Oxidizer Air System Upgrade

Duke Solutions
Kingsport, Tennessee

Lauren Engineers & Constructors provided conceptual engineering, scope development, detailed engineering, procurement, construction and start-up for upgrades to Eastman Chemical's TPA oxidizer air system. Project included a new 500 HP air compressor, automating seven existing compressors and computer control and load sharing for eleven compressors. Work on this fixed price contract included foundation, structures, equipment, piping, electrical, instrumentation and control systems.


Plant Air System Upgrade

Duke Solutions
Columbia, South Carolina

Lauren Engineers & Constructors was responsible for design and construction of upgrades to the Carolina Eastman plant air system. Scope included the installation of air dryers, the automation of several compressors and the installation of numerous water removal traps. The work included foundations, structures, equipment, piping, electrical, instrumentation and controls.


Adipic Acid Crystallization Expansion

Monsanto Chemical Company
Gonzales, Florida

Lauren Engineers & Constructors was responsible for the design, procurement, and installation of new electrical and instrumentation systems required for the addition of this new process in an existing chemical plant. The new electrical systems included primary power service and branch circuits for new equipment, lighting, and control systems added to the Fisher-Provox DCS. New instrumentation systems required numerous remote mounted devices and PLC's that are monitored and managed from an existing distributed control system. Lauren supplied and installed all control devices, conduit, cable, fixtures and primary power equipment.


Electrical and Instrumentation (DCS)

Monsanto Chemical Company
Greenwood, South Carolina

Lauren Engineers & Constructors designed, supplied, and installed the new electrical power distribution system for this expansion of an existing synthetic yarn facility. Scope included design of the distributed control system interface and remote instrumentation, as well as installation, calibration and commissioning of all instrumentation systems. Lauren also designed, provided and installed motor control centers, cable tray, conduit, cable, devices, and lighting systems.


Electrical Design and Construction - Vydyne Plant

Monsanto Chemical Company
Pensacola, Florida

Lauren Engineers and Constructors designed and installed the electrical and process control systems for Monsanto's vydyne plant in Pensacola, Florida. The work was performed under the terms of a fixed price contract that was based on conceptual process design for the new facility. The project was commissioned for operation seven months after the start of the installation work.