L1/P3
PET Resin Expansion
Wellman, Inc.
Bay St. Louis, Mississippi
Lauren Engineers & Constructors
provided the engineering, procurement and construction
for Wellman’s Pearl River Plant P.E.T. Resin expansion,
located in Port Bienville Industrial Park, Bay St. Louis,
Mississippi. This project included the addition of 300 million
pounds of additional solid stating capacity annually to
the facility, using Buhler technology.
|
|
 |
Solid
Stating Facility
KoSa
Salisbury, North Carolina
Lauren Engineers & Constructors
was responsible for the engineering, procurement, and construction
of a new fiber solid stating facility at Salisbury, North
Carolina, using proprietary Buhler technology. Work on this
fixed price contract included foundations, structures, buildings,
convey systems, equipment, piping, electrical, instrumentation
and control systems. Project was completed twelve months after
receiving the notice to proceed. |
|
 |
P.E.T.
Solid Stating Facility
Tolaram/Buhler
Asheboro, North Carolina
Lauren Engineers & Constructors provided engineering,
procurement and construction services for a new P.E.T. solid
stating facility at Tiepet's Asheboro, North Carolina plant.
Work included foundations, structures, buildings, access
facilities, equipment, piping, electrical and instrumentation.
|
 |
Polymer
Expansion Project
DAK AMERICAS
Charleston, South Carolina
Lauren Engineers & Constructors was responsible for
detailed engineering, procurement, and construction for
this polymer expansion project. The project included the
addition of a new 450 ton/day solid stating facility, using
proprietary Buhler technology, the addition of IPA handling
and mixing facilities, increasing the capacity of the existing
melt phase process, and installation of material handling
facilities including storage and railcar loading and unloading.
Plant utilities were also upgrades on this project. The
work was fixed price and was completed in fourteen months.
|
 |
Solid
Stating Facility
ITW / Signode
Florence, Kentucky
This solid stating facility that processes recycled plastic
bottles into the raw granules used to manufacture plastic
strapping was designed and constructed by Lauren Engineers
and Constructors. Lauren worked with the client and the
technology provider to prepare a schedule "A"
package and definitive cost and estimate for the project.
Lauren then performed the detailed engineering for the facility
and self-performed construction for a five-story, 100 foot
high building adjacent to the client's existing facility.
The project lasted nine months and Lauren completed the
work within the original scheduled completion date.
|
 |
Polymer
Solid Stating Plant
Eastman Chemical Company
Columbia, South Carolina
Lauren Engineers & Constructors was responsible for
the design and construction of this Polymer Solid Stating
Plant in Columbia, South Carolina. Detailed construction
drawings for the foundations, mechanical, electrical, piping,
instrumentation and architectural scope were based on process
design prepared by the client. The design was prepared concurrent
with construction to support the aggressive schedule for
project completion. A new four-level steel-frame process
building [19,000 sq. ft.] was constructed to house the new
process systems. The process equipment scope included the
installation of large heaters, reactors, and storage bins
in addition to numerous pumps, blowers and cyclones. The
product piping systems were large diameter [18" to
60"] low pressure systems made from stainless steel
material. All lighting, branch circuits and control wiring
systems utilized the extensive cable tray and steel conduit
systems. The new distributed control system was installed
to interface with the existing Control Room platform to
blend the operation of the new process into the existing.
The project was commissioned for operation thirteen months
after the start of detailed design. |
|
|
|
|
|
|
|
 |
|